the Sub · system
She runs herself within hard safety limits, with comms and health telemetry throughout, and layered recovery — drop-weights, a timer release and an acoustic pinger — to bring her home if anything goes wrong.
| LTE modem | Sixfab 4G/LTE kit, Quectel EG25-G | Arrived |
| Iridium | RockBLOCK 9603 (SMA antenna mode) | Arrived |
| Leak sensors ×2 | SOS leak sensor | Arrived |
| Iridium antenna | Maxtena M1621HCT-P-SMA (passive Iridium helical, 1616-1626.5MHz, SMA-M, IP67) | Arrived |
| Water temp | Celsius sensor | Arrived |
| Burn wire ×2 | Nichrome 80, 30 + 32 AWG spools | Arrived |
| Release hardware | 316 springs/pins + 25lb lead shot | Planned |
| Tether | Fathom Slim 100m (ROV-ready) | Planned |
| Tether interface | Fathom-X board pair | Planned |
| Acoustic recovery beacon | Commercial 37.5kHz ULB — RJE ULB-362PL (power-loss auto-activate, ~90-day) | Planned |
| Hi-vis surface marker | Hi-vis flag/pennant on mast + retroreflective tape | Arrived |
| Tube sensors ×6 | BME280 (temp/RH/baro) — seal integrity | Arrived |
| Power monitors ×6 | INA228 high-side I2C | Arrived |
| Hydrophone | Aquarian H2a + USB audio interface | Planned |
| Internal mic | SPH0645 I2S MEMS | Arrived |
| Leak probes | Extra SOS probes + tips | Arrived |
| Burn-wire sense | Continuity sense resistors | Planned |
| I2C mux ×2 | TCA9548A ×2 + Qwiic cables | Arrived |
| Engine room cam | 160° USB board cam + pan servo + LED strip | Planned |
| AIS receiver | dAISy 2+ USB AIS receiver + small VHF whip on the mast | Planned |